Update time. Had a busy 3 days in the basement hand digging out around 8 to 10 inches of dirt in preparation for placing the floor. You can see where the dirt used to be from the dark brick line at the bottom of the pictures.

What the pictures don't show is the 6ft or so of vertical height that the dirt had be run up on ramps to the drive way before into the skip!







Hoping to buy the materials when I get paid at the end of the month and get mixing. Fingers crossed I can work in it before the champs rolls along.