Spend the day working out a plan for 2 weeks time. Hoping to attend Barnsley with some Feathers and also have an event in March with Scot-Bots so i've a week plus the odd day to get them going for those.

Only a small amount of work needed for Rover and Jr.

Rover: Not really too suitable for the Scot-Bot events with the bang-bang speed control style the way it is and the batteries were from a drill so didn't last too long. After about 90s-2mins it would go into a death spin and be totally uncontrollable. So i've a set of ESC's, either 85A BotBitz ones or an XXL to put in there and change the batteries from 16.8v and roughly 100mAh to 14.4v 3700mAh.

Eric Jr: Have changed from 3700mAh 14.4v to 3700mAh 12v, pretty much because I have a lot of 12v batteries and not a lot of 14.4v and Rover needed a bit more speed to make it interesting. Also easier for Rover to drive around for longer more safely. Also needs some sort of electrical gremlin sorting out whereby each contact with anything makes the robot die, but there is still power and the robot works when the link is removed and replaced. I'm just going to tighten each connection and hope that helps. Any other suggestions?

Cicatrix: WIll maybe get the lifters set up that I have...maybe.

And then to Eric Jr2 which gets a post of its own....