Just some M10 bolts going through the RG1000 into corresponding Nyloc nuts that have been press-fitted (read: hit with a hammer) into the Nylon chassis. Four of them in total, although it only ran with two of them at the UK champs. I had hoped to make it in such a way that access to the bolts and removal of the pods was quick and easy but it never happened like that
However, since the pods are most likely going to be swapped between events rather than between fights, speed isn't necessarily of the essence, so hopefully Tony won't mind the hassle