Register To Comment
Results 1 to 10 of 87

Thread: Team Trouble - Build diary

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #16
    and a pic of it from the front, the triangle bits of hardox are only really tacked on so don't judge!

    [attachment=0j7fadt6]BILD0004.JPG[/attachmentj7fadt6]

    next major steps are getting the beater cut out which is being sorted by dave, and getting bearings put into the bulkheads- again something ill get done at work asap.

    lipos gonna sit behind the motor aswell so space is gonna be tight but should make for a solid little robot hopefully.

    all of thats about 7kg there, 3.5kg beater makes it 10.5kg, then throw in lipos and the top lid etc so it should be do-able, ill add more hardox to it if the weight allows.
    Attached Images Attached Images

Register To Comment

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •