Anyone else still have to do alot of work to get there robot ready
Yup
Took a day off work as I figured I'd need it, just about to print out all the event details, checklist, draw, directions etc and then I'll be making a start on things. So hopefully working 9-5 (don't start dancing) on robot stuff, although got to head into town for petrol, food, drinks and haircut at various points throughout the day, but should be enough time for everything