Found these links on the Aussie forum, thought I'd share for anyone interested:
Found these links on the Aussie forum, thought I'd share for anyone interested:
Wonderful arena. The floor is steel and the sides are double glazed. As you can see it can handle heavyweight spinners well. Takes 2.5 days to put up and 3 days to take down though.
And for those who would like to see the best American, Brazilian and other spiners in action, all captured by a high speed camera and set to music:
Bookmarks