only 2 of the plates have the framework welded under them, the other 2 are just sat on for the pic. inbetween the legs theres going to be X braces, So once i have done the other 2 floor sections and the 12 X braces the bottom half pretty much complete. Got alot of cleaning up to do. 2 full new cans of black spray paint burst over most of the stuff iv cut and the leg frames. a piece of 100mm x 5mm flat bar 2000mm long fell over onto the cans. made a right mess. More annoyed about it going all over my new trainers, and my jeans are covered in paint.
Bookmarks