Hey guys

Been a while since I posted, lots gone on since.

the small news first: Due to run in with Variant, I had to get a new battery and new chassis for Stewie, which was kindly milled out for me by ALK engineering (AKA Kenny), I'll be putting it together shortly

The antweight Saint (Whom I've given the working title 'St Jimmy') is coming along well, very hard to fit all the stuff in the cylindrical body :P

I have found out since Wigan that the cause of Satanix's drive issue was the MIXER was not calibrated, so I'll shortly be fixing that, and once it has been, I'll fit the gyro and go about shaving weight

Now the big news, Cabrakan II is on its way, and very quickly thanks to the sterling efforts of Team Xtreme Robotics (Tom Armitage) and his welding skills, making me a pair of beefy motor mounts and a working weapon.

Yes, no more steel chisel, got myself a lifting wedge:


On this video its only on 0.6A 12v trickle charge power, but Tom reliably informs me it can lift his freind with ease, and the lifter is actually rated for 24v, and I'll be running it on 36v.

More news to come