Ok everyone we had the arena inspection today.
Arena was inspected by Steve and the inspection was also attended by Geoff, Karoline, Grant, Mouldylocks, Learo, Learo Jnr and Grants girlfriend whos name I dont know (sorry)
We struggled with floor issues which we did sort out while everyone was there, the whole arena floor was down, the polycarb screens where up but the roof wasnt up until after the inspection had finished, we spoke to Geoff and Steve who both inspected the roof parts as they were.
We decided that due to the failing weather that people should make a move before it became to snowed in, we (me and the crew) carried on fitting the roof after we discussed we Geoff and Steve, about Steve coming back once the arena roof was up which it now is.

With this agreement in mind I spoke to Andy Kane and Geoff Smith earlier tonight and was informed me that the Rebel Robots Arena is Officially Grade 2F and will be upgraded to Grade 2 once Steve has come to see the completed roof

this should eliminate any doubt in the arena and the worry that we would cancel this event.

on the event, we have everything in place for the day, CO2 tables power cables event a back up generator should Magnas power go down as it has in the past

Best of luck people see you next week