The Entrant is required to supply data sheets and/or computations and/or certified hydrotesting results to prove that the custom component is properly designed and built to have a burst pressure that is 300% of the maximum pressure that the component will be subjected to during operation

Also note that ANY physical modification to a std pneumatic or hydraulic part may put it into the custom component bracket.

(Message edited by woody on January 23, 2009)