Register To Comment
Page 2 of 8 FirstFirst 1234 ... LastLast
Results 11 to 20 of 74

Thread: WarHead Vid

  1. #11
    I was going to say what happened to the tooth??? that must have come off at some stupid speed and carrying some ridicules amount of force.

    What was the roof made of ?

  2. #12
    http://www.battlebots.com/bnc_arena.asphttp://www.battlebots.com/bnc_arena.asp

    According to the site:

    There is a thick grade plastic ceiling covering the roof of the BattleBox .

  3. #13
    kane's Avatar
    Roboteer

    From what I understand, the tooth escaped through a gap between the sheeting and fell from the top.
    Kane Aston
    http://www.makerobotics.com

    Co-owner and builder of BEHEMOTH

  4. #14
    how long does it take to errect that monster arena ??

    john

  5. #15
    Our DRG FCC arena takes about 2-3 days. But after a while we should be able to do it in a day. I would venture to guess Battlebots had about a week.

  6. #16

  7. #17
    mjm
    Guest
    Leo wrote:Our DRG FCC arena takes about 2-3 days
    I reckon with 60 - 80 manhours, at the moment. At Utrecht we put up a lot more than just the arena.

  8. #18



Register To Comment

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •