Jibril
Work has happened. Very descriptive, I know :P The chassis has been modified a little to allow the axe motor and carrier to come out in one piece. The U bolt holding the back of the motor in has been installed and just needs cutting to size. Currently in the process of getting the lids bolted down.

I also adapted the carrier to bolt into the main chassis when installed so that it won't go anywhere. The rear armour plates have been test located and fit, just. I've also, finally, had news on the Scythe and the front wedge plate which *finally* means I can crack on and get this robot finished. The Scythe attachment is going to be a fiddly job, needing my first ever countersinking job and some stubby M10 bolts, preferably in Titanium. It'll make sense when you see it.

I am aiming to have this done by the end of March to give enough time for stress testing before events hopefully restart. Of course, video footage to come soon.