Jibril
The two stage gearbox is almost finished. Everything is roughly lined up so the next thing to do is secure everything own in the box, mount it and then get it affixed to the top and bottom panels. It should result in a stronger build overall and, more importantly, a faster firing Scythe with more power behind it. If I can settle down to get it measured and fitted, I can have it ready by the middle of next week for Bolton.
JPEG_20190626_175056.jpg
Bookmarks