Update time yet again!
The Honey Badger
The robot is now ready to go to Shrewsbury! It has taken longer than I would have liked owing to delays in real life but here it is. Like 2.0, it is a fairly typical wedge design but 4.0 has a couple of improvements over 2.0 with wedge hooks and a polycarbonate scraper which 2.0 didn't have. Armour is 4mm polycarbonate and HDPE.
I still intend to fit a self righting mechanism to this but I've yet to weigh it, probably 1.3kg. Even if I don't get time to fit it, I'll run it like this.
Azriel
So with The Honey Badger 4.0 now a Beetleweight, I've moved Azriel to the Featherweight class. I've got a rolling base with a couple of old Gimson 13.7:1 motors from Kaizen. The next thing to do there is build a body and fit a weapon onto it. I had ummed and ahhed about taking it to RoboDojo but I am unlikely to make it. Still, got time before EXR Portsmouth or Guildford.
Jibril
The axe gear and shaft have been drilled so they'll be refitted over the rest of the week. I am also expecting a pickaxe head to come so I'll cut that down to size and then fit that for Portsmouth while I figure out how to CAD up a Scythe axe head. I have one done but I am not sure if it is any good.




Reply With Quote
Bookmarks