Amai
All the bits for Amai are now here and construction is underway. In keeping with the sweets thing, this one is being made out of a Heroes sweets tub like Osu was. Using a pair of 75:1 N20 motors for this one and if I can't get Ikari working properly soon, I'll move the servo over to that to see if I can get it working on that one.

Building this one for my partner for the Ant Freeze event and then the BotFest event later on, hopefully it'll work. :P Just needs a shell and it is ready to go really.

Jibril
The box section steel arrived fairly quickly so I've made a start on the drilling to mount it to the base plate, one side is already done. I am looking to get it seam welded around the edges to give it more strength but it's generally following the same pattern as the original build. I will be ordering the rest of the drive gears tonight so with any luck, by the end of January, it'll be moving at least and then I'll get to work on the axe.

DSCF6714.JPG