OK, so, if I can have a rolling chassis done for June 1st I should be good... well not good per se... But if it follows a similar time scale, there should be motors, battery, RX, and fusebox, and the wiring that's possible at that point all done and mounted on a base, with (ideally) side armour, top frame and flipper built and ready to install, by the time applications are open. Then I have a good number of holidays that I need to get used throughout June, maybe even 3 weeks worth...
I already know what's going to be the most difficult part of the build, well the 2 most difficult parts, the rear/top section/frame and the flipper linkages.
As soon as they open I'll probably make a snap decision whether I can have it ready or not, then decide when I won't be sleeping after that.
Thanks for the info, looking forward to this.