Plenty happening with Kaizen at the moment as the championship looms ever closer (15 days!). The side panel armament is coming along and I've exhausted my local DIY store of their M6x50mm bolts in the process :P I also did a test assembly today and seems to be OK.
DSCF6629.JPG
Weighs 26kg at the moment, the batteries will add another 1.5kg or so and with the long side HDPE panels and bolts to go, we should be over the 30kg limit no issues though still light for this. The last things needed are:
- Finish the side armour
- Add a bump stop
- Add a locking pin mechanism to the axe
- Mount the LEDs/Removable links
- Install batteries and tidy wires
- Paint box section
- Test drive
Bookmarks