The rebuild is under way now with the following changes

New drive system (speed 900s instead of drills)
Sidewinder speedo instead of Scorpion
8s A123's (replacing 24v Ni-Mh's)
New bulkheads with bearings (old system ran directly on the HDPE bulkheads)

There are a couple of other minor bits but it is all taking shape nicely

Testing to see if the new drive setup would fit


The new disc mechanism- still need to fit the 2nd speed 900


The new setup in place