We should have enough space for things like that - however we haven't been contacted about anything like that as of yet. We would need to look into it a lot first as there are a number of things to consider, such as the arena spec and build, operating the arena and all the usual safety things that go with it.

I expect there will be some time for testing in the main Arena on the Saturday after the talks, however we are still working on the exact timescales we have to work with.

Oh, and no goodie bag - I think weeks of organisation, the use of the arena, plenty of knowledge and the expected costs of arena repairs is about as much as we can stretch to for £10 per head