scruffy 2 has moved along a bit more the actuator has been moved right up the front just behind the face which puts it 1/2 and 2/3 from the pivot once the front of the lifter is added


i also intend to put wheel arches to protect the tops of the wheels at the moment i cant decide whether to use a chunk of steel tube, as i have some 100mm di tube or to do something more like bigger brother