Register To Comment
Page 21 of 32 FirstFirst ... 11192021222331 ... LastLast
Results 201 to 210 of 317

Thread: Gimson Robotics

  1. #201
    Tolerances? The GR01's were + 1mm if I remember right

  2. #202
    At very worst these are +/-0.1mm on part dimensions or +/-0.2mm on overall dimensions such as the distance from front to rear section mounting holes. It's a big step-up in precision from the GR01's

  3. #203
    So, enlarging the 2 front holes, redrilling the 2 aft holes, adding some washers and shorten the axle should make it a 1 on 1 replacement for the GR01.

  4. #204
    Shame both Conker II and Binky were water jet cut to match the GR01's, we are going to have to re drill those beautifully cut bases now

  5. #205
    Max's Avatar
    Member

    Quote Originally Posted by Eventorizon
    Shame both Conker II and Binky were water jet cut to match the GR01's, we are going to have to re drill those beautifully cut bases now
    Or try to find some second hand ones

  6. #206
    or make some different gr-02 mounts

  7. #207
    Progress is being made, the shafts should be finished by Tuesday then gearbox assembly will begin in earnest.


  8. #208
    Having costed up the options we will be offering an external bearing kit for the GR02 for those who want to place a load or wheel on the end of the shaft but don't have bulkheads in which to put a support bearing. The bearing block itself may of course be used separately from the GR02 as well.

    Apologies for the appallingly coloured render(!):


  9. #209
    That I like. Really good idea. Makes the whole product more flexible (not like that!) and brings them back into line for replacing drills.

  10. #210

Register To Comment

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •