leedssss
Printable View
leedssss
Better get a move on then, but Swansea grim reaper will be going down ;)
cover the holes as soon as possible, during the build there is more change of iron/steel or stuff like that getting in.
I cleaned my the other day, it was closed from day one, i was amazed how much dirt was in it.
When your working on robots you will be surprised what them magnets suck in.,I would stick some tape on em at least.
going to spend a few hours friday after work on this so ill get it done then :)
going to parkside steel tomorrow after work to get some 20-20mm box section to start rebuilding the lids and today from work i got some 15mm bar for where the ram connects to the arm. So now thats the flipper side of things completly sorted, just drive mainly now which is being sorted soon as
might have a cheeky go with the weapon friday too by just bodging the pneumatics for now with a random valve some 12mm pipe and spare fittings i have.
Had a bit of time today after work so did a bit on grim reaper.
pics below....
[attachment=2:323uh7d4]BILD0037.JPG[/attachment:323uh7d4]
[attachment=1:323uh7d4]BILD0038.JPG[/attachment:323uh7d4]
[attachment=0:323uh7d4]BILD0039.JPG[/attachment:323uh7d4]
[attachment=2:gz5bggtq]BILD0040.JPG[/attachment:gz5bggtq]
[attachment=1:gz5bggtq]BILD0041.JPG[/attachment:gz5bggtq]
[attachment=0:gz5bggtq]BILD0042.JPG[/attachment:gz5bggtq]
[attachment=0:2jkm16dq]BILD0043.JPG[/attachment:2jkm16dq]
old and new next to each other, not going to put any of the central box section on, just going for 3.2 hardox instead to make all the shape.
more to come soon
[attachment=0:um7353vd]BILD0044.JPG[/attachment:um7353vd]
[attachment=2:um7353vd]BILD0045.JPG[/attachment:um7353vd]
[attachment=1:um7353vd]BILD0046.JPG[/attachment:um7353vd]
[attachment=0:1epfxr2h]BILD0047.JPG[/attachment:1epfxr2h]
few more hours today, left out 1 section as im not sure what wheel set up im going for yet
more to come soon :)