Re: Liftoff (FW) build diary
To bad, depends how you look at it. Those plastic push locks are strong enough for 10 bar.
But then the hose needs to go in perfectly straight, without any sideway force or pull on it.
At work we have problems in that respect. Packaging machines have in certain cases pistons that move along with the packaging material, even for meters.
If it is done well, it takes years before any hose or push lock fails, and then it's most of the time the result of degradadion by heat or UV light.
But some lazy people take a short cut when that happens. Not replacing the hose, but just cutting out the failed piece and by pulling and using up the slack reconnecting the 2 parts with a connector. And if that doesn't work, by rerouting the hose, not even bothering to see if it chafes or pulls at anything. Result. More problems.
Re: Liftoff (FW) build diary
Guess you're right maddox, the elbow fittings from the QEV to the 5way valve are a bit stressed - think I'll replace them with threaded 90' fittings, should come shorter than the current set-up and the fittings will be better aligned.
Here is a clip(Hope it works!) of the LP system test. Didn't bother connecting the solenoid, the valve has a manual deploy button :wink:
Looks like it's working ok, will have a better idea when the actuator is finished and tested
http://i8.photobucket.com/albums/a49...d/th_00000.jpg
Progress with the build of the chassis and motor housing is in good progress as well,
Started off with these motors
http://i8.photobucket.com/albums/a49...d/P1060541.jpg
Took them apart
http://i8.photobucket.com/albums/a49...d/P1060543.jpg
And put them on a diet :lol:
http://i8.photobucket.com/albums/a49...d/P1060544.jpg
After some sweat and a good slimming treatment with the belt sander they look like this:
http://i8.photobucket.com/albums/a49...d/P1060546.jpg
Now the motors can fit into this... the motor housing/retainer
http://i8.photobucket.com/albums/a49...d/P1060547.jpg
Motor housing bolted on to baseplate
http://i8.photobucket.com/albums/a49...d/P1060576.jpg
bottom view of baseplate
http://i8.photobucket.com/albums/a49...d/P1060575.jpg
And these are the parts competed so far
http://i8.photobucket.com/albums/a49...d/P1060577.jpg
I'm happy with the progress so far, not much problems till now apart from HDPE being a bit difficult to work with till you get used to it. Hope that by next week I'll get the actuator and wheels, I want to see it moving :D
Re: Liftoff (FW) build diary
That is a lot of rivnuts.
Re: Liftoff (FW) build diary
''That is a lot of rivnuts.'' well I had the team telling me the base was flimsy, my dad saying that normal wood screws will get pulled through the base - so I did something to prove them all wrong! :lol:
To be honest all those screws are an overkill, but that's where most of the power is concentrated, the motors and the hinge point for the flipper arm...so better safe than sorry :wink:
Re: Liftoff (FW) build diary
Very sensible, lots of fixings make a strong robot
Re: Liftoff (FW) build diary
Quote:
Originally Posted by Liftoff
Guess you're right maddox, the elbow fittings from the QEV to the 5way valve are a bit stressed - think I'll replace them with threaded 90' fittings, should come shorter than the current set-up and the fittings will be better aligned.
Could always go for smaller tubing for the retract (buffer fill). That would allow for a tighter bend radius.
Re: Liftoff (FW) build diary
That's true Kane - but I got no ''retract'' in this system, the tube which is out of alignment (the one from the 5 way valve to the QEV) is the main supply to the buffer tank. Retract will be by spring dampers or bungee chord.
Its still a good option to use smaller tubing though, lets see how the actuator goes and then proceed from there - I only need to lift 17kg, and if my calculations are right, using a 63mm dia actuator at 10bar should get a force of 300kg, should be enough I hope :roll: might also consider lowering the pressure to conserve Co2 and get less stress on the whole bot...
Re: Liftoff (FW) build diary
Looks really good. Don't forget your dump valve though.
Re: Liftoff (FW) build diary
''Don't forget your dump valve though'' Hmm...totally ignored that :?
I could place one on the regulator inlet, but that will be difficult to operate from outside (as per FRA regs.).
Having said that I probably wont need it as its not listed in these regulations where the competition will take place:
http://ieeesbmalta.org/index.php?option ... mitstart=1
Will try to think of how it could get incorporated into the system anyway - can someone please post a pic or link of a similar valve just to get an idea, thanks
Re: Liftoff (FW) build diary
this looks really good so far! :D
btw, you don't need large tubing on the buffer tank feed.