Did High Roller get done in time for moto and if so how did it do
Printable View
Did High Roller get done in time for moto and if so how did it do
I havent seen it mentioned in the event reports and im sure that ive read that he didnt get finished in time.
Chris - ^_^
Nope, did not get done in time... I am going to re-design the whole thing after I finish it!!! The only thing that I have left to really do is weld up an arm. Other than that, it got all done. Soon, soon I hope!!! 2 jobs and school has been having me going like crazy lately!
~Chad
Is there a quick connect fitting that will give high flow and handle full bottle pressure? I am thinking of using a hydraulic fitting, but I dont know if it will leak.
Thanks
Not to my knowledge. If you want any good flow youll need a large quick connect coupling, and those are heavy.
But leaking. They will after a while, most kinds of Orings dont like liquid CO2.
Thank you
Has anyone tried using a 1/4 turn ball valve activated by a cordless drill to pressurise a HP ram? I have seen that Paul Cooper uses a LP ram to open a 1/4 turn ball valve in M2XT.
a high torque servo would probably be better, and i think has been used before, drill would be too big and hard to control just to do 1/4 turn.
Might open abit slow to get the full flowrate that the valve can produce, hence why paul opted for pneumatic operation i pressume.
other option may be a big solenoid, you would probably need two though, one to push each way.